Tech-BF-052
Carrying out works on tightening the bolts of the metal structures of the supporting frame, technological platforms, and stair flights at various levels of the main […]
Execution period:from 25.01.2023 to 03.09.2023
Tech-BF-050
Inspection and maintenance of ventilation systems on the territory of "Shymkentcement" JSC
Execution period:from 17.08.2022 to 31.12.2023
Tech-BF-048
Installation of a thermal ventilation system at the packaging area of finished products of OF-1 BGOK
Execution period:from 03.05.2020 to 03.11.2021
Tech-BF-046
Installation of an oil accounting and control system on all heavy mining and auxiliary equipment, compatible with the ORACLE program
Execution period:from 01.09.2023 to 31.12.2023
Tech-BF-044
Washing, cleaning, and disinfecting the water supply and distribution system of Aktogay GOK facilities (twice a year)
Execution period:from 10.04.2023 to 10.04.2026
Tech-BF-042
Maintenance of HVAC equipment in buildings and structures of the mine for the years 2023–2025
Execution period:from 13.01.2023 to 13.01.2025
Tech-BF-040
Repair/reconstruction works of Kazakhtelecom power transmission lines
Execution period:from 22.11.2022 to 31.12.2022
Tech-BF-038
Cleaning of the mixed motor oil tank at the Ground Force oil distribution station at the central warehouse
Execution period:from 18.10.2022 to 25.10.2022
Tech-BF-036
Installation of an automated control system for heating, ventilation, and air conditioning (HVAC) at substation 3320-ER-307
Execution period:from 06.09.2022 to 06.12.2022
Tech-BF-034
Repair of the Petro Kazakhstan gearbox using Metalock technology
Execution period:from 01.06.2022 to 01.09.2022
Tech-BF-032
Replacement of filter media at the water treatment station in shift camp No. 2
Execution period:from 23.05.2022 to 25.05.2022
Tech-BF-030
Provision of labor resources for the maintenance and repair of geomembrane covering at the enrichment plants for processing sulfide and kaolinized ores
Execution period:from 24.02.2022 to 24.02.2024
Tech-BF-028
Maintenance of control and safety systems at the "Beineu-Bozoi-Shymkent" Gas Pipeline: Periodic maintenance of control and safety systems.
Execution period:from 01.01.2022 to 01.12.2022
Tech-BF-026
Installation of low-voltage systems on the access railway for monitoring the safety of operations for the delivery and removal of wagons
Execution period:from 01.10.2021 to 01.11.2021
Tech-BF-024
Replacement of thermal insulation of external pipelines of the water treatment station and installation of a well on the "raw" water pipeline in the territory of […]
Execution period:from 02.08.2021 to 02.10.2021
Tech-BF-022
Replacement of filter media at the Sewage Treatment Plant
Execution period:from 04.07.2021 to 06.08.2021
Tech-BF-020
Provision of labor resources for inspections, lubrication, and repair of equipment at the Concentration Plants
Execution period:from 17.06.2021 to 17.06.2022
Tech-BF-018
Works on the repair/reconstruction of communication lines/linear-cable structures; Repair of 6–10 kV cable lines;
Execution period:from 15.03.2021 to 31.12.2023
Tech-BF-016
Commissioning of the 4th injection compressor Karachaganak Petroleum Operating B.V.: Commissioning of 4ICP.
Execution period:from 01.01.2021 to 31.12.2021
Tech-BF-014
Provision of services for the replacement of filter media at the water treatment station of the shift camp
Execution period:from 23.10.2020 – to 31.10.2020
Tech-BF-012
Maintenance of heat exchangers for the cooling system of the gearless drive of the semi-autogenous grinding (SAG) mill and ball mills.
Execution period:from 08.06.2020 to 31.12.2021
Tech-BF-010
Flushing, cleaning, and disinfection of the reservoir, water supply, and water distribution system of the Bozshakol GOK facilities (annually)
Execution period:from 03.03.2020 to 03.03.2026
Tech-BF-008
Modification of the water treatment installation at TCO: Transfer of RC500 controllers to Honeywell C300.
Execution period:from 01.01.2020 to 01.12.2020
Tech-BF-006
Repair and restoration work on the large boiler house of the shift camp, electric boilers, piping, and shut-off valves
Execution period:from 11.11.2019 to 30.12.2019
Tech-BF-004
Cleaning of the suction and discharge pipelines of peristaltic pumps for copper concentrate No. 463, 464, 465 with a length of 575 meters at the sulfide […]
Execution period:from 28.05.2019 to 15.11.2019
Tech-BF-002
Replacement of filter media at the water treatment station of shift camp No. 1 BGOK
Execution period:from 27.11.2018 to 30.09.2020
Tech-BF-051
Installation of anchorage points for safety systems on the equipment of the Concentration Plants of KAZ Minerals Bozshakol LLP
Execution period:from 23.09.2022 to 31.12.2023
Tech-BF-049
Construction and installation works for the arrangement of additional ventilation and aspiration systems. Installation of a scrubber system
Execution period:from 11.11.2020 to 20.12.2020
Tech-BF-047
Installation of supply and exhaust ventilation in the ALS laboratory on the territory of the ZIF in Akbakay
Execution period:from 01.09.2023 to 31.12.2023
Tech-BF-045
Disinfection and cleaning of drinking water reservoirs and pipelines by LLP "Tepke"
Execution period:from 26.07.2023 to 29.07.2023
Tech-BF-043
Inspection, adjustment, survey, maintenance, and repair of wells on the fire pipeline, fire hydrants, fire valves, internal and external fire gates, and internal and external fire […]
Execution period:
Tech-BF-041
Commissioning of the Vesda fire system at NCOC: Commissioning of the aspirating fire alarm system.
Execution period:from 01.01.2023 to 31.12.2023
Tech-BF-039
Conducting maintenance and repair of scrubber systems in the production laboratory
Execution period:from 09.11.2022 to 09.12.2023
Tech-BF-037
Sealing (preservation) of the water intake well No. 1 of the tailings dam at the Bozshakol deposit
Execution period:from 29.09.2022 to 10.10.2022
Tech-BF-035
Turnkey works for the development of the project and installation of an alkali dosing unit for the neutralizer and control of the pH value of wastewater
Execution period:from 12.08.2022 to 12.12.2022
Tech-BF-033
Replacement of filter media in the shift camp at the deposit in 2022
Execution period:from 01.06.2022 to 10.06.2022
Tech-BF-031
Replacement, pressure testing, and cleaning of the pipeline system and tank of the Ground Force oil distribution station in the maintenance and repair shop for quarry […]
Execution period:from 22.05.2022 to 28.06.2022
Tech-BF-029
Maintenance of APS (automatic crossing signaling) in the amount of 5 units
Execution period:from 09.02.2022 to 01.03.2024
Tech-BF-027
Commissioning of FGP control systems at TCO: Cyclical inspections and functional tests.
Execution period:from 01.01.2022 to 01.12.2022
Tech-BF-025
Maintenance and repair of scrubber and ventilation systems of the central analytical laboratory
Execution period:from 21.08.2021 to 14.09.2021
Tech-BF-023
Services for the installation of a thermal ventilation system at the pumping station for the disposal of enrichment sands at the kaolin ore beneficiation plant
Execution period:from 27.07.2021 to 27.07.2022
Tech-BF-021
Repair and maintenance of elevators in the new shift camp of the GOK in 2021-2023
Execution period:from 17.06.2021 to 17.03.2023
Tech-BF-019
Modernization of the nitrogen station at the tire fitting section for heavy mining equipment at MMA
Execution period:from 10.06.2021 to 10.09.2021
Tech-BF-017
Maintenance of telescopic dispersion systems (TDS)
Execution period:from 15.03.2021 to 31.12.2023
Tech-BF-015
Development of a SCADA system for well control at TCO: Automation of the wellhead.
Execution period:from 01.01.2021 to 31.12.2021
Tech-BF-013
Provision of services for flushing 1500 m of pipelines at the flotation and thickening unit
Execution period:from 20.07.2020 to 28.10.2020
Tech-BF-011
Conducting maintenance for 20,000 operating hours on direct-drive compressors Hertz HSC 55D
Execution period:from 16.04.2020 to 30.09.2020
Tech-BF-009
Repair and restoration work on the small boiler house of the shift camp, electric boilers, piping, and shut-off valves
Execution period:from 30.01.2020 to 30.01.2021
Tech-BF-007
Modernization and modification of the liquefied gas system at TCO: Transfer of old Allen-Bradley controllers to Honeywell C300 and Safety Manager.
Execution period:from 01.01.2020 to 01.12.2020
Tech-BF-005
Cleaning of the suction and discharge pipelines of screw pumps No. 402, 406, with a length of 175 meters at the sulfide plant
Execution period:from 28.05.2019 to 15.11.2019
Tech-BF-003
Development of a substation automation system at TCO: Automation of electrical substations.
Execution period:from 01.01.2019 to 31.12.2019
Tech-BF-001
Comprehensive works on the operation and maintenance of external engineering infrastructure facilities - domestic sewage networks on the territory of the sulfide plant (OF-1)
Execution period:from 07.11.2018 to 07.11.2019
Const-CC-43
Replacement of window blocks
Execution period:from 01.10.2023 to 01.12.2023
Const-CC-42
Manufacture and installation of the shelter for the oil station 3330-LU-110
Execution period:from 27.09.2023 to 15.10.2023
Const-CC-41
Construction and installation works: “Modification of the aspiration system at the packaging and shipment area of concentrate”
Execution period:from 03.09.2023 to 01.04.2024
Const-CC-40
Installation of bus stops at the RAV/LAB, MMA, Oir, OF-2, and packaging area sections
Execution period:from 21.08.2023 to 01.10.2023
Const-CC-39
Conducting construction and installation works for the concreting of the foundation for the pump 35ZP-RU-468A at the copper concentrate thickening area of the Aktogay-2 Sulfide Plant
Execution period:from 11.08.2023 to 11.02.2024
Const-CC-38
Conducting construction and installation works for the technical water pipeline with the installation of water cannons at the animal care area of plots 160/161/162
Execution period:from 02.08.2023 to 02.10.2023
Const-CC-37
Repair of floors with polyurethane-cement coating in the maintenance building of BGOK, 2100 sq.m
Execution period:from 05.07.2023 to 20.08.2023
Const-CC-36
Reinforcement of the southern eroded slope in the area of the Alarko warehouse at the Bozshakol deposit
Execution period:from 19.05.2023 to 30.09.2023
Const-CC-35
Inspection, adjustment, examination, maintenance, and repair of wells on the fire pipeline, fire hydrants, fire valves, internal and external fire gates, internal and external fire water […]
Execution period:from 03.02.2023 to 03.02.2026
Const-CC-34
Service contract for the maintenance and repair of buildings and structures of FOK
Execution period:from 31.01.2023 to 31.12.2023
Const-CC-33
Repair/reconstruction works of Kazakhtelecom power transmission lines
Execution period:from 22.11.2022 to 31.12.2022
Const-CC-32
Laying of the pedestrian walkway from the Central Control and Dispatch Point (CCDP) to the bus stop of the shift camp
Execution period:from 10.10.2022 to 10.11.2022
Const-CC-31
Repair of the 2nd floor office, dining room, safety coordinator's office, metallurgists' office, and meeting room of OF-2 at the kaolin ore processing plant
Execution period:from 10.10.2022 to 10.11.2022
Const-CC-30
Repair of floors with polyurethane-cement coating in the maintenance building of BGOK, 1300 sq.m
Execution period:from 05.10.2022 to 05.11.2022
Const-CC-29
Installation of anchor points for fall protection systems on the equipment of the enrichment plants of KAZ Minerals Bozshakol
Execution period:from 23.09.2022 to 31.12.2023
Const-CC-28
Concreting the foundation for pump 3445-PU-406A in the collective flotation area
Execution period:from 16.09.2022 to 01.10.2022
Const-CC-27
Installation of an automated control system for heating, ventilation, and air conditioning (HVAC) at substation 3320-ER-307
Execution period:from 06.09.2022 to 06.12.2022
Const-CC-26
Manufacture and installation of protective barriers for OF-1 BLOCK
Execution period:from 18.08.2022 to 18.11.2022
Const-CC-25
Turnkey works for the development of the project and installation of the alkali dosing unit and pH control system for wastewater
Execution period:from 12.08.2022 to 12.12.2022
Const-CC-24
Conducting fireproofing treatment of the wooden structure in the sports complex
Execution period:from 13.07.2022 to 31.07.2022
Const-CC-23
Repair and reconstruction works of fences, doors, gates, and turnstile systems at gas distribution stations.
Execution period:from 04.07.2022 to 04.08.2023
Const-CC-22
Major repair of the hangar at the mining and processing plant (GOK).
Execution period:from 25.04.2022 to 25.05.2022
Const-CC-21
Concreting the foundation for pump 3340-PU-333 (350G-MSU-G), and installation of pump 3340-PU-333 (3500-MCU-G) in the modification building of the Sulfide Plant
Execution period:from 22.04.2022 to 11.05.2022
Const-CC-20
Provision of insulation services for the covering in the attic spaces of the shift camp
Execution period:from 05.04.2022 to 05.05.2022
Const-CC-19
Application of horizontal and vertical color markings, safety signs, and informational signs at the central warehouse
Execution period:from 04.03.2022 to 04.04.2022
Const-CC-18
Repair of the electrical service premises of OG-2 and the general service control point-220kV with the installation of walls and ceilings made of non-combustible materials
Execution period:from 11.02.2022 to 11.03.2022
Const-CC-17
Repair of the central analytical laboratory building in 2022
Execution period:from 22.01.2022 to 22.05.2022
Const-CC-16
Manufacture and installation of fences for the conveyor park of OF-1 BGOK
Execution period:from 13.08.2021 to 13.10.2021
Const-CC-15
Replacement of thermal insulation of external pipelines at the water treatment station and installation of a well on the "raw" water pipeline in the territory of […]
Execution period:from 02.08.2021 to 02.10.2021
Const-CC-14
Services for the installation of a thermal ventilation system at the pumping station for the disposal of enrichment sands at the kaolin ore processing plant of […]
Execution period:from 27.07.2021 to 27.07.2022
Const-CC-13
Installation of anchor points for the safe execution of ongoing construction, repair, and preventive maintenance work on the roof structures of the scrubber building and the […]
Execution period:from 09.07.2021 to 30.07.2021
Const-CC-12
Replacement of window blocks in the lantern structure of the electrolysis workshop at the Oxide Plant site.
Execution period:from 29.06.2021 to 01.08.2021
Const-CC-11
Cosmetic repair of the Station building at Bozshakol station.
Execution period:from 10.06.2021 to 10.07.2021
Const-CC-10
Installation of metal bumpers along the ground conveyor CV-102 at the mining and processing plant (GOK).
Execution period:from 27.04.2021 to 04.05.2021
Const-CC-09
Repair/reconstruction works of communication lines/linear-cable structures; Repair of 6-10 kV cable lines;
Execution period:from 16.04.2021 to 25.06.2021
Const-CC-08
Painting and varnishing of containers at the central warehouse of BGOK.
Execution period:from 14.04.2021 to 14.05.2021
Const-CC-07
Construction and installation works for the arrangement of additional exhaust ventilation and aspiration systems. Installation of a scrubber system.
Execution period:from 11.11.2020 to 20.12.2020
Const-CC-06
Repair works in the central analytical laboratory building
Execution period:from 14.09.2020 to 30.04.2021
Const-CC-05
Repair and restoration works on the roof of the core storage building with the installation of a pavement around the building
Execution period:from 16.09.2020 to 12.11.2020
Const-CC-04
Reconstruction of the existing hangar into a grain storage facility
Execution period:from 14.06.2020 to 14.07.2020
Const-CC-03
Installation of a thermal ventilation system at the packaging area of the finished products of sulfide production
Execution period:from 03.05.2020 to 03.11.2021
Const-CC-02
Replacement of windows in the RAV building of BGOK
Execution period:from 06.04.2020 to 06.05.2020
Const-CC-01
Construction and installation works of inspection wells. Cleaning of pipelines of the circulating water supply systems of the tailing facilities of enrichment plant No. 1.
Execution period:from 01.07.2019 to 27.08.2019
Des-CS-14
Author supervision for the project "Water supply, heating, and fire extinguishing system of shift camp No. 2"
Execution period:from 16.08.2023 to 16.08.2024
Des-CS-13
Development of the major repair project for the 7 km section of the Aktogay station - Kola village highway
Execution period:from 09.02.2023 to 09.08.2023
Des-CS-12
Development of a modernization project for the aspiration system at the concentrate packaging and shipment station KBL
Execution period:from 01.02.2023 to 01.08.2023
Des-CS-11
Research and consulting services for improving the use of fluoroplastic filters in membrane bioreactors, with subsequent reporting and data transfer for Karabatan Utility Solution
Execution period:from 08.12.2022 to 08.05.2023
Des-CS-10
Design of the construction project: "Water supply, heating, and fire extinguishing systems of the shift camp"
Execution period:form 01.05.2022 to 01.11.2022
Des-CS-09
Development of passports and determination of the efficiency of ventilation installations at the mining and processing plant (MPC)
Execution period:from 18.10.2021 to 31.12.2022
Des-CS-08
Development of a working project for connecting the building in the quarry to internal communications
Execution period:from 22.06.2021 to 22.02.2022
Des-CS-07
Author supervision for the project "Design of 6/0.4 kV substations and modernization of the electrical network of the production laboratory"
Execution period:from 01.01.2021 to 31.12.2021
Des-CS-06
Engaging a design organization to prepare defect lists during reconstruction, major, and current repairs of buildings, structures, and engineering systems
Execution period:from 01.01.2021 to 31.12.2021
Des-CS-05
Author supervision for the project "Development of a modernization project for the aspiration system at the concentrate packaging and shipment station"
Execution period:from 28.12.2020 to 28.03.2023
Des-CS-04
Development of working documentation for the major repair of substations (bk/vd 0.4 kV): boiler houses No. 1 and No. 2, transformer substations No. 1, 2, 3, […]
Execution period:from 01.01.2019 to 31.12.2019
Des-CS-03
Development of the modernization project for the aspiration system at the packaging and shipment station of KAL concentrate.
Execution period:form 20.05.2020 to 16.10.2020
Des-CS-02
Design of 6/04 kV substations and modernization of the electrical network of the production laboratory.
Execution period:from 25.03.2020 to 28.05.2021
Des-CS-01
Development of project documentation "Installation of additional exhaust ventilation and aspiration systems in the production laboratory of KAZ Minerals Bozshakol"
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-22
Design, equipment supply, and construction and installation works: "Modification of the aspiration system at the concentrate packaging and shipment site"
Execution period:from 01.02.2023 to 31.12.2023
Asp-BFE-21
Author supervision for the project "Development of a modernization project for the aspiration system at the concentrate packaging and shipment station"
Execution period:from 01.01.2021 to 31.12.2021
Asp-BFE-20
Audit of aspiration systems
Execution period:from 01.01.2021 to 31.12.2021
Asp-BFE-19
Construction and installation works for the arrangement of additional exhaust ventilation and aspiration systems. Installation of a scrubber system
Execution period:from 11.11.2020 to 20.12.2020
Asp-BFE-18
Development of a project for the aspiration system at the concentrate packaging and shipment station
Execution period:from 01.01.2020 to 31.12.2020
Asp-BFE-17
Aspiration of the seed plant
Execution period:from 01.01.2020 to 31.12.2020
Asp-BFE-16
Technical maintenance and scheduled preventive repair of industrial aspiration complexes at factories processing judge and kaolinized ores for 2019–2024.
Execution period:from 06.06.2019 to 06.06.2024
Asp-BFE-15
Development of project documentation "Arrangement of additional exhaust ventilation and aspiration systems in the production laboratory of LLP "KAZ Minerals Bozshakol"
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-14
Aspiration of the dry mix mixer
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-13
Aspiration of the grain elevator at the bread factory
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-12
Aspiration of the elevator
Execution period:from 01.01.2018 to 31.12.2018
Asp-BFE-11
Aspiration of the spring production line
Execution period:from 01.01.2017 to 31.12.2017
Asp-BFE-10
Aspiration of the packaging machine
Execution period:from 01.01.2017 to 31.12.2017
Asp-BFE-09
Aspiration of the air chute
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-08
Aspiration of the pellet production line. Explosion protection of the aspiration system
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-07
Telescopic sleeves for loading non-granulated meal into open vehicles
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-06
Aspiration of the paint production line
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-05
Aspiration of the belt conveyors of the port elevator. Explosion protection of the aspiration system
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-04
Aspiration of the cake mix production line. Explosion protection of the aspiration system.
Execution period:from 01.01.2015 to 31.12.2015
Asp-BFE-03
Aspiration of the kiln in gypsum production
Execution period:from 01.01.2015 to 31.12.2015
Asp-BFE-02
Centralized dust collection system of the foundry shop
Execution period:from 01.01.2015 to 31.12.2015
Asp-BFE-01
Spark capture system for the aspiration system
Execution period:from 01.01.2015 to 31.12.2015
Tech-BF-052
Carrying out works on tightening the bolts of the metal structures of the supporting frame, technological platforms, and stair flights at various levels of the main […]
Execution period:from 25.01.2023 to 03.09.2023
Tech-BF-050
Inspection and maintenance of ventilation systems on the territory of "Shymkentcement" JSC
Execution period:from 17.08.2022 to 31.12.2023
Tech-BF-048
Installation of a thermal ventilation system at the packaging area of finished products of OF-1 BGOK
Execution period:from 03.05.2020 to 03.11.2021
Tech-BF-046
Installation of an oil accounting and control system on all heavy mining and auxiliary equipment, compatible with the ORACLE program
Execution period:from 01.09.2023 to 31.12.2023
Tech-BF-044
Washing, cleaning, and disinfecting the water supply and distribution system of Aktogay GOK facilities (twice a year)
Execution period:from 10.04.2023 to 10.04.2026
Tech-BF-042
Maintenance of HVAC equipment in buildings and structures of the mine for the years 2023–2025
Execution period:from 13.01.2023 to 13.01.2025
Tech-BF-040
Repair/reconstruction works of Kazakhtelecom power transmission lines
Execution period:from 22.11.2022 to 31.12.2022
Tech-BF-038
Cleaning of the mixed motor oil tank at the Ground Force oil distribution station at the central warehouse
Execution period:from 18.10.2022 to 25.10.2022
Tech-BF-036
Installation of an automated control system for heating, ventilation, and air conditioning (HVAC) at substation 3320-ER-307
Execution period:from 06.09.2022 to 06.12.2022
Tech-BF-034
Repair of the Petro Kazakhstan gearbox using Metalock technology
Execution period:from 01.06.2022 to 01.09.2022
Tech-BF-032
Replacement of filter media at the water treatment station in shift camp No. 2
Execution period:from 23.05.2022 to 25.05.2022
Tech-BF-030
Provision of labor resources for the maintenance and repair of geomembrane covering at the enrichment plants for processing sulfide and kaolinized ores
Execution period:from 24.02.2022 to 24.02.2024
Tech-BF-028
Maintenance of control and safety systems at the "Beineu-Bozoi-Shymkent" Gas Pipeline: Periodic maintenance of control and safety systems.
Execution period:from 01.01.2022 to 01.12.2022
Tech-BF-026
Installation of low-voltage systems on the access railway for monitoring the safety of operations for the delivery and removal of wagons
Execution period:from 01.10.2021 to 01.11.2021
Tech-BF-024
Replacement of thermal insulation of external pipelines of the water treatment station and installation of a well on the "raw" water pipeline in the territory of […]
Execution period:from 02.08.2021 to 02.10.2021
Tech-BF-022
Replacement of filter media at the Sewage Treatment Plant
Execution period:from 04.07.2021 to 06.08.2021
Tech-BF-020
Provision of labor resources for inspections, lubrication, and repair of equipment at the Concentration Plants
Execution period:from 17.06.2021 to 17.06.2022
Tech-BF-018
Works on the repair/reconstruction of communication lines/linear-cable structures; Repair of 6–10 kV cable lines;
Execution period:from 15.03.2021 to 31.12.2023
Tech-BF-016
Commissioning of the 4th injection compressor Karachaganak Petroleum Operating B.V.: Commissioning of 4ICP.
Execution period:from 01.01.2021 to 31.12.2021
Tech-BF-014
Provision of services for the replacement of filter media at the water treatment station of the shift camp
Execution period:from 23.10.2020 – to 31.10.2020
Tech-BF-012
Maintenance of heat exchangers for the cooling system of the gearless drive of the semi-autogenous grinding (SAG) mill and ball mills.
Execution period:from 08.06.2020 to 31.12.2021
Tech-BF-010
Flushing, cleaning, and disinfection of the reservoir, water supply, and water distribution system of the Bozshakol GOK facilities (annually)
Execution period:from 03.03.2020 to 03.03.2026
Tech-BF-008
Modification of the water treatment installation at TCO: Transfer of RC500 controllers to Honeywell C300.
Execution period:from 01.01.2020 to 01.12.2020
Tech-BF-006
Repair and restoration work on the large boiler house of the shift camp, electric boilers, piping, and shut-off valves
Execution period:from 11.11.2019 to 30.12.2019
Tech-BF-004
Cleaning of the suction and discharge pipelines of peristaltic pumps for copper concentrate No. 463, 464, 465 with a length of 575 meters at the sulfide […]
Execution period:from 28.05.2019 to 15.11.2019
Tech-BF-002
Replacement of filter media at the water treatment station of shift camp No. 1 BGOK
Execution period:from 27.11.2018 to 30.09.2020
Tech-BF-051
Installation of anchorage points for safety systems on the equipment of the Concentration Plants of KAZ Minerals Bozshakol LLP
Execution period:from 23.09.2022 to 31.12.2023
Tech-BF-049
Construction and installation works for the arrangement of additional ventilation and aspiration systems. Installation of a scrubber system
Execution period:from 11.11.2020 to 20.12.2020
Tech-BF-047
Installation of supply and exhaust ventilation in the ALS laboratory on the territory of the ZIF in Akbakay
Execution period:from 01.09.2023 to 31.12.2023
Tech-BF-045
Disinfection and cleaning of drinking water reservoirs and pipelines by LLP "Tepke"
Execution period:from 26.07.2023 to 29.07.2023
Tech-BF-043
Inspection, adjustment, survey, maintenance, and repair of wells on the fire pipeline, fire hydrants, fire valves, internal and external fire gates, and internal and external fire […]
Execution period:
Tech-BF-041
Commissioning of the Vesda fire system at NCOC: Commissioning of the aspirating fire alarm system.
Execution period:from 01.01.2023 to 31.12.2023
Tech-BF-039
Conducting maintenance and repair of scrubber systems in the production laboratory
Execution period:from 09.11.2022 to 09.12.2023
Tech-BF-037
Sealing (preservation) of the water intake well No. 1 of the tailings dam at the Bozshakol deposit
Execution period:from 29.09.2022 to 10.10.2022
Tech-BF-035
Turnkey works for the development of the project and installation of an alkali dosing unit for the neutralizer and control of the pH value of wastewater
Execution period:from 12.08.2022 to 12.12.2022
Tech-BF-033
Replacement of filter media in the shift camp at the deposit in 2022
Execution period:from 01.06.2022 to 10.06.2022
Tech-BF-031
Replacement, pressure testing, and cleaning of the pipeline system and tank of the Ground Force oil distribution station in the maintenance and repair shop for quarry […]
Execution period:from 22.05.2022 to 28.06.2022
Tech-BF-029
Maintenance of APS (automatic crossing signaling) in the amount of 5 units
Execution period:from 09.02.2022 to 01.03.2024
Tech-BF-027
Commissioning of FGP control systems at TCO: Cyclical inspections and functional tests.
Execution period:from 01.01.2022 to 01.12.2022
Tech-BF-025
Maintenance and repair of scrubber and ventilation systems of the central analytical laboratory
Execution period:from 21.08.2021 to 14.09.2021
Tech-BF-023
Services for the installation of a thermal ventilation system at the pumping station for the disposal of enrichment sands at the kaolin ore beneficiation plant
Execution period:from 27.07.2021 to 27.07.2022
Tech-BF-021
Repair and maintenance of elevators in the new shift camp of the GOK in 2021-2023
Execution period:from 17.06.2021 to 17.03.2023
Tech-BF-019
Modernization of the nitrogen station at the tire fitting section for heavy mining equipment at MMA
Execution period:from 10.06.2021 to 10.09.2021
Tech-BF-017
Maintenance of telescopic dispersion systems (TDS)
Execution period:from 15.03.2021 to 31.12.2023
Tech-BF-015
Development of a SCADA system for well control at TCO: Automation of the wellhead.
Execution period:from 01.01.2021 to 31.12.2021
Tech-BF-013
Provision of services for flushing 1500 m of pipelines at the flotation and thickening unit
Execution period:from 20.07.2020 to 28.10.2020
Tech-BF-011
Conducting maintenance for 20,000 operating hours on direct-drive compressors Hertz HSC 55D
Execution period:from 16.04.2020 to 30.09.2020
Tech-BF-009
Repair and restoration work on the small boiler house of the shift camp, electric boilers, piping, and shut-off valves
Execution period:from 30.01.2020 to 30.01.2021
Tech-BF-007
Modernization and modification of the liquefied gas system at TCO: Transfer of old Allen-Bradley controllers to Honeywell C300 and Safety Manager.
Execution period:from 01.01.2020 to 01.12.2020
Tech-BF-005
Cleaning of the suction and discharge pipelines of screw pumps No. 402, 406, with a length of 175 meters at the sulfide plant
Execution period:from 28.05.2019 to 15.11.2019
Tech-BF-003
Development of a substation automation system at TCO: Automation of electrical substations.
Execution period:from 01.01.2019 to 31.12.2019
Tech-BF-001
Comprehensive works on the operation and maintenance of external engineering infrastructure facilities - domestic sewage networks on the territory of the sulfide plant (OF-1)
Execution period:from 07.11.2018 to 07.11.2019
Const-CC-43
Replacement of window blocks
Execution period:from 01.10.2023 to 01.12.2023
Const-CC-42
Manufacture and installation of the shelter for the oil station 3330-LU-110
Execution period:from 27.09.2023 to 15.10.2023
Const-CC-41
Construction and installation works: “Modification of the aspiration system at the packaging and shipment area of concentrate”
Execution period:from 03.09.2023 to 01.04.2024
Const-CC-40
Installation of bus stops at the RAV/LAB, MMA, Oir, OF-2, and packaging area sections
Execution period:from 21.08.2023 to 01.10.2023
Const-CC-39
Conducting construction and installation works for the concreting of the foundation for the pump 35ZP-RU-468A at the copper concentrate thickening area of the Aktogay-2 Sulfide Plant
Execution period:from 11.08.2023 to 11.02.2024
Const-CC-38
Conducting construction and installation works for the technical water pipeline with the installation of water cannons at the animal care area of plots 160/161/162
Execution period:from 02.08.2023 to 02.10.2023
Const-CC-37
Repair of floors with polyurethane-cement coating in the maintenance building of BGOK, 2100 sq.m
Execution period:from 05.07.2023 to 20.08.2023
Const-CC-36
Reinforcement of the southern eroded slope in the area of the Alarko warehouse at the Bozshakol deposit
Execution period:from 19.05.2023 to 30.09.2023
Const-CC-35
Inspection, adjustment, examination, maintenance, and repair of wells on the fire pipeline, fire hydrants, fire valves, internal and external fire gates, internal and external fire water […]
Execution period:from 03.02.2023 to 03.02.2026
Const-CC-34
Service contract for the maintenance and repair of buildings and structures of FOK
Execution period:from 31.01.2023 to 31.12.2023
Const-CC-33
Repair/reconstruction works of Kazakhtelecom power transmission lines
Execution period:from 22.11.2022 to 31.12.2022
Const-CC-32
Laying of the pedestrian walkway from the Central Control and Dispatch Point (CCDP) to the bus stop of the shift camp
Execution period:from 10.10.2022 to 10.11.2022
Const-CC-31
Repair of the 2nd floor office, dining room, safety coordinator's office, metallurgists' office, and meeting room of OF-2 at the kaolin ore processing plant
Execution period:from 10.10.2022 to 10.11.2022
Const-CC-30
Repair of floors with polyurethane-cement coating in the maintenance building of BGOK, 1300 sq.m
Execution period:from 05.10.2022 to 05.11.2022
Const-CC-29
Installation of anchor points for fall protection systems on the equipment of the enrichment plants of KAZ Minerals Bozshakol
Execution period:from 23.09.2022 to 31.12.2023
Const-CC-28
Concreting the foundation for pump 3445-PU-406A in the collective flotation area
Execution period:from 16.09.2022 to 01.10.2022
Const-CC-27
Installation of an automated control system for heating, ventilation, and air conditioning (HVAC) at substation 3320-ER-307
Execution period:from 06.09.2022 to 06.12.2022
Const-CC-26
Manufacture and installation of protective barriers for OF-1 BLOCK
Execution period:from 18.08.2022 to 18.11.2022
Const-CC-25
Turnkey works for the development of the project and installation of the alkali dosing unit and pH control system for wastewater
Execution period:from 12.08.2022 to 12.12.2022
Const-CC-24
Conducting fireproofing treatment of the wooden structure in the sports complex
Execution period:from 13.07.2022 to 31.07.2022
Const-CC-23
Repair and reconstruction works of fences, doors, gates, and turnstile systems at gas distribution stations.
Execution period:from 04.07.2022 to 04.08.2023
Const-CC-22
Major repair of the hangar at the mining and processing plant (GOK).
Execution period:from 25.04.2022 to 25.05.2022
Const-CC-21
Concreting the foundation for pump 3340-PU-333 (350G-MSU-G), and installation of pump 3340-PU-333 (3500-MCU-G) in the modification building of the Sulfide Plant
Execution period:from 22.04.2022 to 11.05.2022
Const-CC-20
Provision of insulation services for the covering in the attic spaces of the shift camp
Execution period:from 05.04.2022 to 05.05.2022
Const-CC-19
Application of horizontal and vertical color markings, safety signs, and informational signs at the central warehouse
Execution period:from 04.03.2022 to 04.04.2022
Const-CC-18
Repair of the electrical service premises of OG-2 and the general service control point-220kV with the installation of walls and ceilings made of non-combustible materials
Execution period:from 11.02.2022 to 11.03.2022
Const-CC-17
Repair of the central analytical laboratory building in 2022
Execution period:from 22.01.2022 to 22.05.2022
Const-CC-16
Manufacture and installation of fences for the conveyor park of OF-1 BGOK
Execution period:from 13.08.2021 to 13.10.2021
Const-CC-15
Replacement of thermal insulation of external pipelines at the water treatment station and installation of a well on the "raw" water pipeline in the territory of […]
Execution period:from 02.08.2021 to 02.10.2021
Const-CC-14
Services for the installation of a thermal ventilation system at the pumping station for the disposal of enrichment sands at the kaolin ore processing plant of […]
Execution period:from 27.07.2021 to 27.07.2022
Const-CC-13
Installation of anchor points for the safe execution of ongoing construction, repair, and preventive maintenance work on the roof structures of the scrubber building and the […]
Execution period:from 09.07.2021 to 30.07.2021
Const-CC-12
Replacement of window blocks in the lantern structure of the electrolysis workshop at the Oxide Plant site.
Execution period:from 29.06.2021 to 01.08.2021
Const-CC-11
Cosmetic repair of the Station building at Bozshakol station.
Execution period:from 10.06.2021 to 10.07.2021
Const-CC-10
Installation of metal bumpers along the ground conveyor CV-102 at the mining and processing plant (GOK).
Execution period:from 27.04.2021 to 04.05.2021
Const-CC-09
Repair/reconstruction works of communication lines/linear-cable structures; Repair of 6-10 kV cable lines;
Execution period:from 16.04.2021 to 25.06.2021
Const-CC-08
Painting and varnishing of containers at the central warehouse of BGOK.
Execution period:from 14.04.2021 to 14.05.2021
Const-CC-07
Construction and installation works for the arrangement of additional exhaust ventilation and aspiration systems. Installation of a scrubber system.
Execution period:from 11.11.2020 to 20.12.2020
Const-CC-06
Repair works in the central analytical laboratory building
Execution period:from 14.09.2020 to 30.04.2021
Const-CC-05
Repair and restoration works on the roof of the core storage building with the installation of a pavement around the building
Execution period:from 16.09.2020 to 12.11.2020
Const-CC-04
Reconstruction of the existing hangar into a grain storage facility
Execution period:from 14.06.2020 to 14.07.2020
Const-CC-03
Installation of a thermal ventilation system at the packaging area of the finished products of sulfide production
Execution period:from 03.05.2020 to 03.11.2021
Const-CC-02
Replacement of windows in the RAV building of BGOK
Execution period:from 06.04.2020 to 06.05.2020
Const-CC-01
Construction and installation works of inspection wells. Cleaning of pipelines of the circulating water supply systems of the tailing facilities of enrichment plant No. 1.
Execution period:from 01.07.2019 to 27.08.2019
Des-CS-14
Author supervision for the project "Water supply, heating, and fire extinguishing system of shift camp No. 2"
Execution period:from 16.08.2023 to 16.08.2024
Des-CS-13
Development of the major repair project for the 7 km section of the Aktogay station - Kola village highway
Execution period:from 09.02.2023 to 09.08.2023
Des-CS-12
Development of a modernization project for the aspiration system at the concentrate packaging and shipment station KBL
Execution period:from 01.02.2023 to 01.08.2023
Des-CS-11
Research and consulting services for improving the use of fluoroplastic filters in membrane bioreactors, with subsequent reporting and data transfer for Karabatan Utility Solution
Execution period:from 08.12.2022 to 08.05.2023
Des-CS-10
Design of the construction project: "Water supply, heating, and fire extinguishing systems of the shift camp"
Execution period:form 01.05.2022 to 01.11.2022
Des-CS-09
Development of passports and determination of the efficiency of ventilation installations at the mining and processing plant (MPC)
Execution period:from 18.10.2021 to 31.12.2022
Des-CS-08
Development of a working project for connecting the building in the quarry to internal communications
Execution period:from 22.06.2021 to 22.02.2022
Des-CS-07
Author supervision for the project "Design of 6/0.4 kV substations and modernization of the electrical network of the production laboratory"
Execution period:from 01.01.2021 to 31.12.2021
Des-CS-06
Engaging a design organization to prepare defect lists during reconstruction, major, and current repairs of buildings, structures, and engineering systems
Execution period:from 01.01.2021 to 31.12.2021
Des-CS-05
Author supervision for the project "Development of a modernization project for the aspiration system at the concentrate packaging and shipment station"
Execution period:from 28.12.2020 to 28.03.2023
Des-CS-04
Development of working documentation for the major repair of substations (bk/vd 0.4 kV): boiler houses No. 1 and No. 2, transformer substations No. 1, 2, 3, […]
Execution period:from 01.01.2019 to 31.12.2019
Des-CS-03
Development of the modernization project for the aspiration system at the packaging and shipment station of KAL concentrate.
Execution period:form 20.05.2020 to 16.10.2020
Des-CS-02
Design of 6/04 kV substations and modernization of the electrical network of the production laboratory.
Execution period:from 25.03.2020 to 28.05.2021
Des-CS-01
Development of project documentation "Installation of additional exhaust ventilation and aspiration systems in the production laboratory of KAZ Minerals Bozshakol"
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-22
Design, equipment supply, and construction and installation works: "Modification of the aspiration system at the concentrate packaging and shipment site"
Execution period:from 01.02.2023 to 31.12.2023
Asp-BFE-21
Author supervision for the project "Development of a modernization project for the aspiration system at the concentrate packaging and shipment station"
Execution period:from 01.01.2021 to 31.12.2021
Asp-BFE-20
Audit of aspiration systems
Execution period:from 01.01.2021 to 31.12.2021
Asp-BFE-19
Construction and installation works for the arrangement of additional exhaust ventilation and aspiration systems. Installation of a scrubber system
Execution period:from 11.11.2020 to 20.12.2020
Asp-BFE-18
Development of a project for the aspiration system at the concentrate packaging and shipment station
Execution period:from 01.01.2020 to 31.12.2020
Asp-BFE-17
Aspiration of the seed plant
Execution period:from 01.01.2020 to 31.12.2020
Asp-BFE-16
Technical maintenance and scheduled preventive repair of industrial aspiration complexes at factories processing judge and kaolinized ores for 2019–2024.
Execution period:from 06.06.2019 to 06.06.2024
Asp-BFE-15
Development of project documentation "Arrangement of additional exhaust ventilation and aspiration systems in the production laboratory of LLP "KAZ Minerals Bozshakol"
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-14
Aspiration of the dry mix mixer
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-13
Aspiration of the grain elevator at the bread factory
Execution period:from 01.01.2019 to 31.12.2019
Asp-BFE-12
Aspiration of the elevator
Execution period:from 01.01.2018 to 31.12.2018
Asp-BFE-11
Aspiration of the spring production line
Execution period:from 01.01.2017 to 31.12.2017
Asp-BFE-10
Aspiration of the packaging machine
Execution period:from 01.01.2017 to 31.12.2017
Asp-BFE-09
Aspiration of the air chute
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-08
Aspiration of the pellet production line. Explosion protection of the aspiration system
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-07
Telescopic sleeves for loading non-granulated meal into open vehicles
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-06
Aspiration of the paint production line
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-05
Aspiration of the belt conveyors of the port elevator. Explosion protection of the aspiration system
Execution period:from 01.01.2016 to 31.12.2016
Asp-BFE-04
Aspiration of the cake mix production line. Explosion protection of the aspiration system.
Execution period:from 01.01.2015 to 31.12.2015
Asp-BFE-03
Aspiration of the kiln in gypsum production
Execution period:from 01.01.2015 to 31.12.2015
Asp-BFE-02
Centralized dust collection system of the foundry shop
Execution period:from 01.01.2015 to 31.12.2015
Asp-BFE-01
Spark capture system for the aspiration system
Execution period:from 01.01.2015 to 31.12.2015